This week I had to make up two sections of large box gutters to waterproof an area of a barn we're converting.![]() |
As we're now doing them up it need to be water proof. We stripped off the cladding and the first four or five runs of slates so we could see what we were working with.
I then started at the lowest point and made the first step. A 1.4m run of ply that had a good fall on it. I then worked my way back to the other end of the roof creating each 1.4m run of gutter with a 50mm step between each level Each bit has to be fully supported and built in such a way to take the lead.
![]() |
| Working on the roof |
![]() |
| One stretch of leaded gutter |