I removed some tired looking flush doors that had been filled one too many times and replaced them with some new 6 panel moulded doors supplied by the customer. I chipped away at the layers of paint on the hinges and had the old doors off in no time, but then the fun began. 

The linings (frames) were all different shapes and nowhere near level or even straight. This made the job a much longer process as I basically had to scribe each door to fit each frame.
To make matters worse the doors supplied (naming no names - B&Q) must have been stacked on a pile of bananas as they were completely warped out of shape ("Oh yes we've had a lot come back" - they said). You might have to open the picture to see how bad. 

I added an extra hinge to each door and made sure they were fixed firmly so hopefully they will pull back into shape (they were all working sweetly by the time I left). When I finished hanging them I chopped in all the locks and loose fitted the handles. 

Then to make sure the doors wouldn't warp due to atmospheric change (heating) I gave each a coat of primer, helping the customer get that bit closer to finishing.
Off to hopefully finish the job on the hotel tomorrow (yes a Sunday!) as very few bookings mean good access to rooms.
Both mother and daughter are doing well although very tired