Another solid Oak floor last week. Glued down to concrete, but this time using a Gekko gun and a lot less messy than with a trowel.
![]() |
Ready to go down |
![]() |
Cutting station set up with dust extractor |
![]() |
Alex with the oversized gun, my partner in crime on this floor! |
![]() |
Midway clamp up, always tricky to keep it tight when gluing a floor to concrete |
![]() |
Wedging up the end at the end of the first day, still another room to go |
![]() |
First floor looking good. |
![]() |
Last board to clamp up. with my patented bent bit of metal and clamps set as spreaders |
![]() |
Track saw making ripping easy |
![]() |
cutting under frames so no expansion gaps can be seen in doorways |
![]() |
Between rooms |
![]() |
Second floor nearing the finish |
![]() |
Sanding up, orbital after the big floor sander has finished just to take off the marks left by the drum |
More pictures to follow. Managed to do the last bit of sanding today so now it's ready for oiling then I can drop back and do the doors, architraves and skirtings.